Translations:MySchedule/18/en

De Documentations Patas-monkey
Version datée du 21 mai 2025 à 14:25 par Liam (discussion | contributions) (Page créée avec « {{Note| In the rest of the document, the term "event" will be used to refer to a native Dolibarr intervention line.}} {| class="wikitable" |- style="vertical-align:top;" | File:Myschedule-detail-event-detail-new.png | Each event is divided into three parts: * The gray block containing the intervention line information ** The intervention reference and its status (first line) ** The start and end times of the intervention line and its duration (second line) **... »)
(diff) ← Version précédente | Voir la version actuelle (diff) | Version suivante → (diff)
Aller à la navigation Aller à la recherche
In the rest of the document, the term "event" will be used to refer to a native Dolibarr intervention line.
Each event is divided into three parts:
  • The gray block containing the intervention line information
    • The intervention reference and its status (first line)
    • The start and end times of the intervention line and its duration (second line)
    • The main description of the intervention is shown as a tooltip of the icon
  • Additional information about the intervention
    • The third party associated with the intervention
    • The description of the intervention line
    • The contract or project, if one has been entered
  • The participants area (user only)
    • The planned and actual durations, if they have already been entered