Translations:Factory/48/en

De Documentations Patas-monkey
Version datée du 7 mai 2025 à 17:05 par Liam (discussion | contributions) (Page créée avec « ===Creating and Launching from Product Sheets=== {| class="wikitable" |- style="vertical-align:top;" | 700px | Once a product's composition has been saved, click on the second-level Manufacturing Order tab in the Factory tab of the product sheet to be manufactured. |- style="vertical-align:top;" | 700px {{Note|It is possible to create a manufacturing order even if there is insufficient stock on the... »)
(diff) ← Version précédente | Voir la version actuelle (diff) | Version suivante → (diff)
Aller à la navigation Aller à la recherche

Creating and Launching from Product Sheets

Once a product's composition has been saved, click on the second-level Manufacturing Order tab in the Factory tab of the product sheet to be manufactured.

It is possible to create a manufacturing order even if there is insufficient stock on the creation date: You can replenish your warehouses between the creation date of the manufacturing order and its validation.